Ease My PrepEase My Prep
All Articles
GeographyPIB21 July 2026

Progress of Sagarmala Programme, Port Modernisation and Multimodal Connectivity

Practice PYQs on this topic

500+ questions on Geography with explanations

Open App

๐Ÿ“Œ Summary:

  • Sagarmala is a central sector scheme of the Ministry of Ports, Shipping & Waterways to promote port-led development
  • Funds projects under 5 pillars: port modernisation, port connectivity, port-led industrialisation, coastal community development, and coastal shipping & inland water transport
  • 79 projects completed and 54 under implementation across coastal states/UTs (per Annexures)
  • Major Ports capacity rose to 1,728.4 MT (2025-26); average turnaround time at Major Ports improved to ~47.25 hours (provisional) from 58.28 hours (2024-25)
  • 294 rail/road connectivity projects identified: 84 completed (63 rail, 21 road), 66 under implementation, 144 at planning stage
  • Connectivity within port limits handled by Port Authorities; beyond limits by MoR/MoRTH/State Governments

๐ŸŽฏ UPSC Relevance: GS3 economy โ€” infrastructure, port-led development, multimodal/logistics connectivity, coastal economy

๐Ÿ“ Prelims Facts:

  • Sagarmala = central sector scheme under Ministry of Ports, Shipping & Waterways; 5 pillars
  • Major Ports capacity 1,728.4 MT (2025-26); turnaround time ~47.25 hours
  • Major Ports are under the Union Ministry; Non-Major Ports under States/UTs

๐Ÿ”‘ Key Term: Turnaround time โ€” the total time a ship spends at a port from arrival to departure; a key measure of port efficiency

Sagarmalaportsinfrastructuremultimodal connectivity

UPSC Classification

Prelims (GS1)
Mains
PrelimsMains

See PYQs related to โ€œGeographyโ€

Every classification tag above links to actual UPSC questions asked on that topic โ€” with answer, explanation and elimination logic. Only in the app.

Download App